18MW High-Capacity Data Centre, South Dublin
Construction of a new two storey, 13,000m² high capacity data centre in South Dublin.
13000
Square Metres
40
Million Contract Value
12
Months Project Duration

Project Overview

Demolition of an existing warehouse and construction of a new two-storey, 13,000m² high-capacity data centre. The project was delivered to a fast-track programme over six phases, with five subsequent phases delivered in a live campus environment. All of the phases involved critical environment tie-ins on systems, both electrically and mechanically.

Works included the construction of the main structural frame working under ‘live’ overhead 110kV Eirgrid lines. The scope also included a full Cat A fitout of an administration area and the full CSA and MEP fitout to six data halls and supporting technical areas. All works were delivered on a very constrained site. The scope included the design and build of a new turnkey 110kV substation complete with M&E fitout to meet Eirgrid specifications.

We managed, coordinated and integrated all client direct vendors and long-lead equipment on the project. Additionally, we coordinated and integrated the BMS, EPMS and security systems. All systems were commissioned from Level 1 – 5 to IST.

The project was completed on a live operational campus with a focus on business continuity at all times.

Key Features

  • Full CSA and MEP build
  • Data hall pre-action dry sprinkler system
  • On-site high-capacity diesel farm
  • 110 kV to 20 kV substation
  • A, B and C below RAF bus duct power distribution system
  • Working under live 110kV power lines
  • Works carried out on a live campus
  • Coordination and integration of all client direct vendors and equipment
  • Full commissioning to IST
Project Team
Client:
Confidential
Architect:
Confidential
Quantity Surveyor:
Confidential
Structural Engineer:
Confidential
M&E Consultant:
Confidential
Project Details
Contract Value:
€40 Million
Floor Area:
13,000m²
Duration:
12 months