Enabling works followed by construction of a two-storey Research and Development facility at Carrigtwohill, Co. Cork.
2000
Square Metres
18
Million Project Value
12
Month Project Duration

Project Overview

Construction of a new facility extension to the existing IC1 Membrane Manufacturing Plant at Merck Millipore, Tullagreen, Carrigtwohill, Co Cork. The project, known as the “Membrane Pilot R&D Facility”, is comprised of approximately 2,000m² of floor space split over two levels.

The structure is comprised of a structural steel frame, including a composite metal deck at first floor level. The building façade comprises insulated metal cladding with removable panels and glazing. Internal fitout works comprised of stud partition walls, ceilings, flooring, installation, testing and commissioning as well as validation of mechanical and electrical systems and equipment.

We installed high-specification laboratories to a bespoke design, the lab furniture incorporated concealed medical gas, DI water, vacuum, power and data containment – all integrated into high level bench pedestals. The benches were all constructed from Trespa including Trespa worktops. Suspended services modules incorporated further medical gas outlets, data, power and fume extract pendants. The laboratories also incorporated fume cupboards, complete with automatic sash control (linked to the room environmental controls) and associated extract systems.

Key Features

  • Construction and fitout of a two-storey “L” shaped extension abutting existing manufacturing plant
  • 19 ISO 7/8 cleanrooms for bulk filter membrane (1,690m²)
  • All works were carried out on a live manufacturing / pharmaceutical site
  • Installation, testing and commissioning of all specialist services and client equipment
Merck Millipore Ireland
Project Team
Client:
Merck Millipore Ireland
Architect:
Devereux Architects
Quantity Surveyor:
PM Group
Structural Engineer:
PM Group
M&E Consultant:
PM Group
Project Details
Contract Value:
€18 Million
Floor Area:
2,000m²
Duration:
12 months