The Trinity City Hotel
Extension and upgrade works to the Trinity City Hotel on Pearse Street comprising a 43-bed new build and a 33-bed roof top extension covering 5,000 m², increasing the capacity of the hotel by 30%.
5000
Square Metres
13
Million Project Value
22
Month Project Duration

Project Overview

This project involved the extension and upgrade works to the existing Trinity City Hotel on Pearse Street comprising of a 43-bed new build and a 33-bed roof top extension covering 5,000m², increasing the capacity of the hotel by 30%.

Works involved a lift replacement, front lobby and kitchens upgrade, along with the construction of a new admin building.

This project required close liaison with the hotel operator as it remained operational throughout the works.

Key Features

  • 33-bed roof top extension
  • 43-bed new build
  • New administration building
MHL Hotel Collection
Project Team
Client:
MHL Hotel Collection
Architect:
Henry J Lyons Architects
Quantity Surveyor:
O’Byrne Jenkins
Structural Engineer:
Barrett Mahony Consulting Engineers
M&E Consultant:
Homan O’Brien Associates
Project Details
Contract Value:
€13 Million
Floor Area:
5,000m²
Duration:
22 Months