Regeneron Biotechnology Campus

Multiple projects on Regeneron’s live research, development, manufacturing and distribution campus in Limerick over the last number of years.

Multistorey Carpark & Infrastructural Works

  • Design and build contract
  • 4 storey multistorey carpark on the operational Regeneron Pharmaceutical campus
  • 800 car park spaces
  • Efficient precast design
  • Using precast enabled the construction of the substantial structure to take place off site whilst significant earthworks / substructure were ongoing on-site
  • Designed with structural capacity for further floors if required in the future

 

Process Science Building

  • Substructure, groundworks, superstructure RC works and fitout to a new Admin Lab Building within the live Regeneron Pharmaceutical campus
  • Building finishes contract for the new Admin Lab Building
    • Partitions & ceilings
    • Floor finishes
    • Glazed screens
    • Steel doors / Balustrades
    • Wall finishes
    • Furniture – fitted and loose
    • Fireproofing

Project Team

Client:
Regeneron Pharmaceuticals GmbH

Construction Manager:
PM Group

Quantity Surveyor:
PM Group

Architect:
Jacobs Engineering

Engineer:
Jacobs Engineering

M&E Engineer:
Jacobs Engineering


Project Details

Contract Value:
€34 Million across multiple projects

Floor Area:
26,700 m2

Duration:
27 months