Edwards Lifesciences

CSA Fitout and Enabling works contractor for Edwards Lifesciences new plant in Limerick.

  • CSA fitout contractor for a 17,700 m² medical device production facility at National Technology Park. Plassey, Limerick
  • The facility incorporates cleanroom production suites, laboratory spaces, along extensive administration areas, staff restaurant and welfare facilities
  • 2,500 m² of ISO7 cleanroom.
  • 242 doors consisting of rapid rise doors, steel doors, timber doors, swing gates, hermetically sealed sliding doors into the clean room
  • 15,000 m² of production areas floor slabs (mainly FM2)
  • Bespoke high-end fitout of 11m high atrium in main reception with of with full height oak veneered joinery panels
  • Enabling works contractor

Project Team

Client:
Edwards Lifesciences Ireland

Construction Manager:
Jacobs Engineering

Design - Architecture & Engineering:
Jacobs Engineering

Quantity Surveyor:
Linesight


Project Details

Contract Value:
€20.5 Million

Floor Area:
17,700 m2

Duration:
20 months