Data Centre – Site Enabling Works
Extensive data centre site works on 28 acres, including bulk earthworks for a 16,000m² Data Hall and Electrical building circa 60,000m3. Also including car parking, a new site access road, internal roadways, sprinkler tank, pump house, water and fuel tanks.


- Bulk earthworks and disposal for 16,000 m² Data Hall and Electrical building c.60,000 m3
- Bulk earthworks cut and filling works to roads, car parks
- 250 RC Pad foundations
- Pyrite treatment to mudstone and rock exposed in excavations works
- Full 3D modelling and co-ordination works for utilities installation to predict and avoid services clash
- External and Internal Utilities installation works including 65,000m high spec fibre optic ducting and large chambers with sealed penetrations using puddle flange and Roxtec adjustable plug
- HV/MV/LV electrical works including large access chambers with full access removable beam access covers
- CCTV/ELV/Fire Main/Water Main/PL & ESB Utility installations
- 5,000m Drainage including up to 750mm diameter pipes with attenuation pond
Project Team
Client:
Confidential
Project Manager:
Jacobs Engineering
Architect:
PM Group
Structural Engineer:
PM Group
Services Engineer:
PM Group
Quantity Surveyor:
Jacobs Engineering
Project Details
Contract Value:
€ 7.5 Million
Duration:
11 Months