A9 Dualling

Construction of 7.45 kilometres dual carriageway between Kincraig and Dalraddy.

  • Rural All Purpose Dual Carriageway (2 x 3.65m lanes in each direction)
  • 2.0m wide Non-Motorised Users route to be provided as footway/cycleway
  • Existing Traffic lanes x 1 in each direction to be maintained at all times
  • 1.8km of existing 2+1 carriageway south of scheme to be reconstructed as single carriageway (1 x 3.65m lane in each direction)

Project Team

Client:
Transport Scotland

Project Manager:
WS Atkins Ltd


Project Details

Contract Value:
€40.0 Million

Road Type / Length:
7.45km Dual Carriageway

Duration:
27 Months