Sysco / Pallas Foods Distribution Centre Site Infrastructure

Design and Build contract for a major Retail Distribution Centre comprising of refrigerated and dry warehousing with high specification office space along with extensive siteworks on a 40 acre site.

  • Enabling, site clearance over a site area of 158,000 m2
  • Substantial cut to fill earthworks across the site (125,000 m3 earth moved) (53,000 m3 lime / cement stabilized)
  • Site access, circulation roads (1.0 km)
  • Storm, foul water drainage (6,500 m) including attenuation ponds (3 no. over 5,500 m2)
  • Paved goods in and out yards including car parks (48,000 m2)
  • Utilities (1,600 m watermain, 19,000 m electrical / comms, 500 m gas main), fencing, hard and soft landscaping

Project Team

Client:
Sysco / Pallas Foods

Architect:
TOTP Architects

Quantity Surveyor:
Arup

Structural Engineer:
PUNCH Consulting Engineers

M&E Consultant:
Ethos Engineering


Project Details

Contract Value:
EUR 5.0m

Road Type / Length
Single Carriageway / 1 km

Duration:
16 months - Completion January 2015