Polmadie Maintenance Depot
Construction of a new Winter Maintenance Depot on a Brownfield site on the east side of Glasgow city including construction of an outfall storm water pipeline.














- Brownfield heavily contaminated site (23,000 sq.m)
- Earthworks cut/fill in heavily contaminated soils including asbestos fibres
- Soft ground improvement techniques
- Surface water drainage, foul drainage, utility ducting and SUDS attenuation pond
- 450mm diameter outfall pipeline construction across live carriageways (J1 M74)
- Landscape screening berm, boundary fencing and RC walls
- Reinforced air entrained concrete slab and permeable paved car parks
Project Team
Client:
Engineer:
Project Details
Contract Value:
Duration:
BEAR Scotland
Jacobs Engineering
EUR 4.0m
8 months